Prince of Wales

ProjectsPrince of Wales For this project, our professionals at D&M Group were contacted by our client to completely renovate an old fashioned pub in Essex during lockdown. We worked closely with the client to understand their specific needs for this particular location; we were required to strip out the fixtures and fittings, safely install new…

GENESIS

ProjectsGenesis A good client of ours contacted us with a longstanding roofing issue allowing water ingress during periods of rain. Due to the significance of the issue D&M wanted to be able to provide a cost effective and long standing solution to their problem. After initial consultations, planning, checks and preparation work began with a…

Garage

ElectricalGarage For this client, D&M group were given a 3 week time scale to install and fit an underground workshop/garage. The space was transformed with a new power source to make it a functioning environment. Data points were also mounted into the walls, providing a network infrastructure. D&M also equipped the space with various features…

Bar

ProjectsBar For this project our client approached D&M due to damaged tiles and a failing subfloor. The client required that the works be completed out of trading hours to minimise disruption to the business. As the works were fairly extensive it needed to be completed in stages rather than a single lift and replace. After…

Blue Bell Carpark Review

Projects & RefurbishmentBlue Bell Carpark D&M where tasked with resurfacing the Blue Bell carpark with smooth new tarmac. The task had risen when D&M where called to bring the Blue Bell car park back to life. This includes the full carpark being being re-tarmaced and resurfaced, as well as new bays being correctly lined by…

Manor Farm

Projects & RefurbishmentManor Farm D&M were tasked with a project which involved the removal and replacement of a staircase, including decking with handrails and refix yellow anti slip stair nosings. Due to the multiple stages involved with this case, engineers worked closely with the client to ensure that the specification was met to their exact…

Plumpton College

ElectricalPlumpton College D&M were tasked with a full LED changeover within the stable, sports hall and residential blocks from the current fluorescent tube installation. The works were required to be completed within a very small window of opportunity for the client due to ongoing teaching and residential courses being held at the college and with great…

Listed Pub

Projects & RefurbishmentListed Pub D&M were required to uplift a small area of T&G 18mm Oak flooring in the bar area and replace it like for like in the listed building. The project started off with the removal of the existing flooring. Once this task was completed a few complications occurred as the subfloor had…

Utility Supplier, Hove

Utility Supplier, Hove For this case, D&M group were approached by a client in Hove and were tasked with the installation of bespoke Daikin VRV systems within the new call centre. As per our usual routine we met with the client to discuss their specific needs and review the project site.                                                                         However, we like to…